Our Completed Projects

THE LINE PROJECT {Shibh Al Jazira (SAJCO)}

Roads Construction ― Civil Works

SCOPE OF WORK:

Excavation & Backfilling Road and Asphalts and tunnel works

KHURAIS PROJECT {SAUDI ARAMCO}

Infra & Construction – Civil Works

SCOPE OF WORK:

Right Of Way Construction Flow Line & Trunk Line, Right Of Way Construction (OHPL), Estimated Cutting of Bulk Soil ON Row, Estimated Filling of Bulk Soil ON Row, Trench Backfilling for line/Trunk Line, Bern Construction For Flow Lines/Trunk Line, Excavation for Sandy Area, Excavation for Rocky Area, Cleaning of Sand From Trench, Cleaning of Sand From Row, Construction Of Wellsite Drain Pit, Rocky Cut & fill, Construction of Junction AA Pad (72m * 75m * 0.5m), Construction of 9 Junction AA Pad (25m * 8m * 0.5m), Extension of Existing Junction Pad to Junction AA, Excavation Thrust Anchor Boring, Camel/Road Crossing for Underground Pipeline

Mazalij And Abu Jifan pipelines Project {SAUDI ARAMCO }

Civil Works

SCOPE OF WORK:

Right Of Way Construction 

Trench Backfilling for flow lines 

Sand Bedding & Padding 

Berm Construction For Flow Lines 

Valve Station (90+958) Length 130m *60m 

Excavation For HDD & Thrust Anchor 

Open Cut Crossing 16′ & 26′ at KP 89.25 and KP 89.28

PS-3 SITE Project {SAUDI ARAMCO}

Civil Works

SCOPE OF WORK:

Right Of Way Construction 

Berm Construction For Flow Lines 

Trench Backfilling for flow lines 

Sand Bedding & Padding 

Onshore Maintain Potential Projects {Ministry of Transportation & logistics}

Civil Works

SCOPE OF WORK:

Sub-grade Compaction 

Aggregate base course

Mazalij And Abu Jifan pipelines Project {SAUDI ARAMCO}

Civil Works

SCOPE OF WORK:

Grading and Cleaning leveling and compaction 

Central Processing Facility (CPF)

Kharj Project {SAUDI ARAMCO}

Civil Works

SCOPE OF WORK:

Right Of Way Construction 

Right Of Way Construction (OHPL) 

Trench Backfilling for flow lines 

Berm Construction For Flow Lines 

Excavation for Sandy Area 

Excavation for Rocky Area 

Construction of Wellsite Drain Pit

KHRS-PKHQKHURIS-BQ Projects {SAUDI ARAMCO }

Civil Works

SCOPE OF WORK:

Right Of Way Construction 

Right Of Way Construction (OHPL) 

Trench Backfilling for flow lines 

Berm Construction For Flow Lines 

Excavation for Sandy Area 

Excavation for Rocky Area 

Construction of Wellsite Drain Pit 

King Salman Park Project

CIVIL & INFRASTRUCTURES WORK

         SCOPE OF WORK:

Excavation work , Back fill, cutting rocks and Site Cleaning,

Topography-King Salman Project

CIVIL WORK 

     SCOPE OF WORK:

Excavation work , Back fill, and Site Cleaning, cutting rocks

Jafurah infrastructures Projects

Facilities infrastructures & site preparation.

                                                   SCOPE OF WORK:

Subcontract for basecourse laying 23cm thick including grading leveling, compaction and watering works. Mixing of basecourse materials at vendors designated stockpile at site vendor responsibility including transportation at site working location. Materials supplied by the vendor