Our Completed Projects
KHURAIS PROJECT {SAUDI ARAMCO}
Infra & Construction – Civil Works
SCOPE OF WORK:
Right Of Way Construction Flow Line & Trunk Line, Right Of Way Construction (OHPL), Estimated Cutting of Bulk Soil ON Row, Estimated Filling of Bulk Soil ON Row, Trench Backfilling for line/Trunk Line, Bern Construction For Flow Lines/Trunk Line, Excavation for Sandy Area, Excavation for Rocky Area, Cleaning of Sand From Trench, Cleaning of Sand From Row, Construction Of Wellsite Drain Pit, Rocky Cut & fill, Construction of Junction AA Pad (72m * 75m * 0.5m), Construction of 9 Junction AA Pad (25m * 8m * 0.5m), Extension of Existing Junction Pad to Junction AA, Excavation Thrust Anchor Boring, Camel/Road Crossing for Underground Pipeline
Mazalij And Abu Jifan pipelines Project {SAUDI ARAMCO }
Civil Works
SCOPE OF WORK:
Right Of Way Construction
Trench Backfilling for flow lines
Sand Bedding & Padding
Berm Construction For Flow Lines
Valve Station (90+958) Length 130m *60m
Excavation For HDD & Thrust Anchor
Open Cut Crossing 16′ & 26′ at KP 89.25 and KP 89.28
King Salman Park Project
CIVIL & INFRASTRUCTURES WORK
SCOPE OF WORK:
Excavation work , Back fill, cutting rocks and Site Cleaning,
Topography-King Salman Project
CIVIL WORK
SCOPE OF WORK:
Excavation work , Back fill, and Site Cleaning, cutting rocks
Jafurah infrastructures Projects
Facilities infrastructures & site preparation.
SCOPE OF WORK:
Subcontract for basecourse laying 23cm thick including grading leveling, compaction and watering works. Mixing of basecourse materials at vendors designated stockpile at site vendor responsibility including transportation at site working location. Materials supplied by the vendor